Republic of Tunisia

Ministry of the National Defense

Development of Rjim Maatoug

  • English
  • Français
  • عربـي

Principal Menu

  • Welcome
  • PRESENTATION OF THE PROJECT
    • HISTORIC OUTLINE
    • The legal framework
    • The project’s objectives
  • THE PROJECT FIRST SLICE
    • PROGRAM OF REHABILITATION AND SUPPORT FOR THE 1st SLICE
    • COMPOSITION OF THE FIRST SLICE’S SMALL AREA
  • THE PROJECT SECOND SLICE
    • COMPOSITION OF THE SECOND SLICE’S SMALL AREA
  • The realization phases
  • THE SUPPORT STATION
  • CONDITIONS OF A SMALL AREA'S ATTRIBUTION
  • CONTRACT OF THE SUPPORT PROGRAM

Portal

Training in the Army
Training in the Air Force
Training in the Navy
National Service
military health

Military History and Heritage
Information and Culture
Military Hospital
CFISM
Lighthouses and beacons
National Mapping and Remote Sensing Center
Professional training

You are here: Home >> THE PROJECT SECOND SLICE >> COMPOSITION OF THE SECOND SLICE’S SMALL AREA

COMPOSITION OF THE SECOND SLICE’S SMALL AREA

  • Print
  • Email

1. Shape and dimension of the small area : rectangle of 165 m / 90 m

2. Plantation :

  • "Deglet Nour" : 220 feet
  • Common variety : 80 feet
  • Male variety : 8 feet

3. Water resources : 01 drilling / unity of 72 ha with an exploitation debit of 60 l/s (a continuous fictitious debit of 0.8 l / s / ha)

4. Irrigation network : a three teeth's Fork of PVC canal (Ø 160 cm) on the median of the small area (160 meters) provided with 23 irrigation grips

5. Protection :

  • Internal protection (intensified protection) : Small area is shared in 6 parts protected by dry palms strengthened by cemented posts every 6 meters
  • External protection of the oasis totality : with the barbed wire to prevent the access of animals

6. Small area allocation : the small area is assigned from its plantation according to choice criteria and contract conditions

7. Works chargeable to the beneficiary after allocation :

    Diversification of associated cultures and introduction of the breeding

8. Support and training :

During 7 years the assignee profits by a support program, a training and follow-up according to the contract conditions 

Read 6227 times
Email
  • Welcome
  • PRESENTATION OF THE PROJECT
  • THE PROJECT FIRST SLICE
  • THE PROJECT SECOND SLICE
    • COMPOSITION OF THE SECOND SLICE’S SMALL AREA
  • The realization phases
  • THE SUPPORT STATION
  • CONDITIONS OF A SMALL AREA'S ATTRIBUTION
  • CONTRACT OF THE SUPPORT PROGRAM

Useful websites

keep in touch

Copyright Ministry of National Defense 2012 | Legal Notice